Total Completion Time Scheduling Problem with Temperature Considerations

Year 2016, Volume: 5 Issue: 2, 185 - 192, 31.12.2016
https://doi.org/10.17100/nevbiltek.284741

Abstract

The focus of this work is to analyze working environment temperature in single-machine scheduling problems. In classical scheduling problems, the processing times are considered usually without the effect of working environment temperature. However, in many real scheduling environments, working environment temperature may affect processing time due to the nature of work. In this paper, we present job processing times based on the working environment temperature for total completion time (square) problem. We derive solutions with polynomial-time for both objectives.

Year 2016, Volume: 5 Issue: 2, 185 - 192, 31.12.2016
https://doi.org/10.17100/nevbiltek.284741

Abstract

There are 0 citations in total.

Details

Journal Section Endüstri Mühendisliği
Authors

M.duran Toksarı

Publication Date December 31, 2016
Published in Issue Year 2016 Volume: 5 Issue: 2

Cite

APA Toksarı, M. (2016). Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim Ve Teknoloji Dergisi, 5(2), 185-192. https://doi.org/10.17100/nevbiltek.284741
AMA Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. December 2016;5(2):185-192. doi:10.17100/nevbiltek.284741
Chicago Toksarı, M.duran. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim Ve Teknoloji Dergisi 5, no. 2 (December 2016): 185-92. https://doi.org/10.17100/nevbiltek.284741.
EndNote Toksarı M (December 1, 2016) Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi 5 2 185–192.
IEEE M. Toksarı, “Total Completion Time Scheduling Problem with Temperature Considerations”, Nevşehir Bilim ve Teknoloji Dergisi, vol. 5, no. 2, pp. 185–192, 2016, doi: 10.17100/nevbiltek.284741.
ISNAD Toksarı, M.duran. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi 5/2 (December 2016), 185-192. https://doi.org/10.17100/nevbiltek.284741.
JAMA Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5:185–192.
MLA Toksarı, M.duran. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim Ve Teknoloji Dergisi, vol. 5, no. 2, 2016, pp. 185-92, doi:10.17100/nevbiltek.284741.
Vancouver Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5(2):185-92.

Dergimizin tarandığı indeksler


12300          20980     2097822081